Skip to content
Yardox

Concrete cost calculator

Enter the size of the pour and the prices you were quoted. Get the volume, the bags, and what ready-mix and bags each cost.

What are you pouring?

01
Slab10 ft10 ft4 in
%

5 % covers an uneven base and spillage. Use 10 % for rough excavations.

Concrete to order1.30 yd³· 59 bags
Add this calculator to your website

Free for any website: paste this code where the calculator should appear. It keeps itself up to date, fits its height to the content and links back to the full page with the explanations.

How to use it

  1. 01Enter the size of each slab, footing, column or post hole, and how many of each.
  2. 02Pick the bag you would buy. The calculator counts the volume to order and the bags.
  3. 03Type the ready-mix price per cubic yard (or m³) you were quoted, any flat delivery or short-load fee, and the price of one bag.
  4. 04Read the total for each way of buying. The cheaper one is highlighted.

How it is calculated

The volume and the bag count come from the concrete calculator. The cost is your prices times those amounts; the calculator holds no prices of its own, because concrete prices change by region, season and supplier.

Ready-mix
volume to order × price per yd³ (or m³) + flat fees
Bags
number of bags × price of one bag
Bags in one cubic yard
27 cu ft ÷ yield of one bag

Bag yields come from the makers’ data sheets: an 80 lb bag of QUIKRETE Concrete Mix makes 0.60 cu ft, so one cubic yard takes 45 bags. A 25 kg bag of SAKRET Premium-Beton makes 11.5 L, so one cubic metre takes 87 bags.

The volume includes 5 % waste for spills, uneven ground and forms that bow. Change it in the calculator if your site needs more.

Ask the ready-mix supplier whether there is a minimum order or a small-load charge, and get the full price of your volume, fees included, before you compare.

Worked example

A 10 × 10 ft patio, 4 in thick

  1. Volume: 10 × 10 × 4 ÷ 12 = 33.3 cu ft; with 5 % waste 35.0 cu ft = 1.30 cu yd.
  2. Bags: 35.0 ÷ 0.60 = 58.3, so 59 bags of 80 lb.
  3. Ready-mix costs 1.30 × your price per cu yd, plus fees. Bags cost 59 × your bag price. Type both and the page shows which is less.
  4. In metric, a 4 × 3 m slab 10 cm thick: 1.26 m³ with waste, or 110 bags of 25 kg.

Getting the order right

Count the work, not only the price

Fifty-nine 80 lb bags weigh 4,720 lb and are mixed one or two at a time. A truck pours the same slab in minutes. Price your time and a mixer rental too.

Get the volume right first

A slab 1 in thicker than planned at one end adds a quarter to a 4 in slab’s volume there. Check the forms with a string line before you order.

Small jobs favour bags

Post holes, a step or a pad for a shed may be below the supplier’s minimum load. Type the quote you get for that load, fees included, and compare.

Common mistakes

  • Comparing the ready-mix price per yard with bags without adding delivery and short-load fees.
  • Counting bags by weight instead of the yield printed on the bag.
  • Ordering exactly the net volume with no waste: a few bags short stops the pour.
  • Forgetting gravel base, rebar or mesh, forms and a mixer in the budget.

Questions

How many bags of concrete make a yard?

45 bags of 80 lb at 0.60 cu ft each, 60 bags of 60 lb at 0.45 cu ft, or 90 bags of 40 lb at 0.30 cu ft, by the yields QUIKRETE prints.

How much concrete for a 10 × 10 slab?

At 4 in thick: 33.3 cu ft, or 1.23 cu yd net; 1.30 cu yd with 5 % waste. That is 59 bags of 80 lb.

Is it cheaper to mix concrete yourself?

It depends on your prices and the size. Type the ready-mix quote with fees and the bag price above; the page compares the two for your exact volume.

Why does the page not show prices?

Concrete prices differ by region, season and supplier, and change often. A price you type from your own quote is more accurate than any average.

Sources

  1. [1]Concrete Mix No. 1101 – Product Data Sheet. QUIKRETE Companies. Yield per bag: 40 lb ≈ 0.30 ft³, 60 lb ≈ 0.45 ft³, 80 lb ≈ 0.60 ft³. Checked November 5, 2026
  2. [2]QUIKRETE 5000 Concrete Mix No. 1007 – Product Data Sheet. QUIKRETE Companies. Yield per bag: 50 lb ≈ 0.375 ft³, 60 lb ≈ 0.45 ft³, 80 lb ≈ 0.60 ft³. Checked November 5, 2026
  3. [3]SAKRET Premium-Beton – Technisches Merkblatt (2025-12-02). SAKRET. Yield 0.46–0.47 l of fresh concrete per kg; we use the lower value 0.46 l/kg (11.5 l per 25 kg bag). Checked November 5, 2026
  4. [4]NIST Handbook 44, Appendix C – General Tables of Units of Measurement. National Institute of Standards and Technology. 1 ft = 0.3048 m (exact); 1 yd³ = 27 ft³ = 0.764555 m³. Checked November 5, 2026

Formulas and sources last checked on November 5, 2026. How we calculate